Key takeaways
- A revision round is one consolidated list of changes on one frozen version, ending in the next version or an approval.
- A round can hold many revisions; a change request outside the brief never uses up a round.
- Count rounds per deliverable and per stage, and write the start, end and counting rules into the quote.
On this page
A revision round is one full cycle of review and change on a piece of creative work: you send a version, the client sends back one consolidated list of changes, and you deliver the next version. Example: you send homepage version 1, the client replies with eight notes in one email, you send version 2. That was round 1. If the client then sends three more notes on version 2, that starts round 2.
Contracts count rounds ("two rounds of revisions included") because a round is easier to count than individual changes. That only works if both sides agree on where a round starts and ends.
Why does a revision round matter?
- It's the unit most quotes are priced in. "Two rounds included, extra rounds billed" only means something if a round has edges.
- It turns a stream of messages into batches. Without rounds, every email, call and chat message is a separate change request, and you can't plan your week.
- It gives every project a finish line. Each round ends in either a new version or an approval. A project with no rounds has no natural point where the client says yes.
Outside design and web work, the phrase means other things. Academic journals use "round of revision" for each pass of peer review on a paper, and editors use it for each pass on a manuscript. This post covers the client-project meaning: design, websites, video, print and copy.
What are the parts of a revision round?
Every round, whatever the medium, has the same five parts:
| Part | What it is | Example (website) |
|---|---|---|
| Version | The exact work being reviewed, frozen so it doesn't change during review | Homepage v2, as it looked on Mar 3 |
| Feedback window | How long the client has to review | Five working days |
| Consolidated list | All the changes, sent together by one person | Nine pinned comments from the marketing lead |
| Response | The work done on that list | Homepage v3 |
| Close | What ends the round: a new version sent, or a written approval | "Approved as final" from the named approver |
The two parts people skip are the frozen version and the close. If the site keeps changing while the client reviews it, nobody knows which version their notes refer to. If rounds never close, the next note always counts as part of the current one.
Revision round vs version vs revision vs change request
These four terms get mixed up constantly, and the confusion is where most scope arguments start.
| Term | What it means | How many per round |
|---|---|---|
| Revision | One change to existing work, inside the agreed brief ("make the headline shorter") | Many: a round usually holds several |
| Revision round | One batch of revisions on one version, from first note to the next version or a yes | One |
| Version | One delivered state of the work (v1, v2, v3) | Each round starts from one version and produces the next |
| Change request | New work outside the brief: a new page, a new concept, a new format | Not part of any round. Quoted separately |
Two things follow from the table. First, "two rounds" doesn't mean "two changes": a round can hold twenty revisions, as long as they arrive as one list. Second, a change request never uses up a round. It's a separate piece of work with its own price.
A fifth term, iteration, is the designer's word for a version made to explore an idea rather than to answer feedback. Internal iterations before the client sees anything don't count as rounds.
When does a round start and end?
A round starts when you send the client a version and ask for feedback.
A round ends in one of three ways:
- You deliver the next version in response to their list. That version starts the next round.
- The client approves the version. No more rounds on this deliverable.
- The feedback window closes with no reply. Most revision policies treat this as either approval or a pause; say which in the contract.
The common edge cases, with the rule we'd use:
| What happens | Same round or new round? |
|---|---|
| Client sends a second email of notes an hour after the first, before you've started | Same round. Merge the lists |
| Client sends more notes after you've started on the list | New round, unless they're fixes to your mistakes |
| You made an error (broken link, typo, wrong logo) | Not a round. Fix it free |
| Two people on the client's team send separate lists | Same round, but ask the named approver to merge them first |
| Client asks for something outside the brief | Not a round. It's a change request |
| You send a version with a known issue, labelled "work in progress" | Not a round. Rounds start on versions you present as ready |
How are revision rounds counted in practice?
Per deliverable, per stage. A website project with "two rounds" usually means two rounds on the homepage design, two on the inner-page templates and so on, not two rounds for the whole site. A video usually means two rounds per cut (rough cut, then fine cut). A logo usually means rounds on the chosen concept after the concepts are presented.
Write the counting rule down. The ambiguity costs more than the rounds themselves.
| Project | Typical counting | Where rounds are counted |
|---|---|---|
| Website design | 2 rounds per page template | Homepage design, inner templates, staging build |
| Logo | 1 round to choose a concept, 2 to refine it | Concept presentation, then refinements |
| Video | 2 rounds after the first cut, plus a polish pass | Rough cut, fine cut |
| Print piece | 2 rounds on the proof, then a final proof | Each PDF proof |
| Copywriting | 2 rounds per page or piece | Each draft |
These are common defaults, not rules. Our posts on how many revisions a designer should include and how many a video editor should include explain how to pick the number.
A short definition you can put in a contract
Revision round definition
To turn the same numbers into full contract wording, use the generator:
This is a template, not legal advice. Rules differ by country and state; ask a lawyer for anything that matters.
How do you keep rounds clear during a project?
- Number every version in the file name and the email subject: "Homepage v2, round 2 of 2".
- Freeze what was reviewed. Send a link or file that won't change under the client while they comment.
- Ask for one list from one person. Our post on who should approve the design covers how to pick that person.
- Close each round in writing. The next version or a clear yes, never silence.
The freezing and closing are where a review tool earns its keep. In TweakTick, each version is a round (V1, V2, V3) that keeps exactly what the client saw, and the round closes when the client approves with a code sent to their email, recorded in the sign-off record. The approvals page shows how it works.
Once the definition is agreed, keeping to the number is a separate habit; our guide to limiting revision rounds covers it step by step.
Close every round with a clear yes
Send each version as a frozen round; your client approves it with an emailed code and you keep the record.
Denzil Sequeira
Founder of TweakTick. He builds it on his own and answers every support email himself. Every number in this article links to its source.