Key takeaways
- A revision policy is the client-facing version of your revision clause: same numbers, plain words.
- Cover nine things: rounds, what a round is, who sends feedback, where, timing, exclusions, price, approval, pauses.
- Put it in the proposal, the kickoff email and every review, and keep it matching your contract.
On this page
A revision policy is a one-page set of rules you give every client before work starts. It covers how many rounds of changes the price includes, what one round is, who sends feedback, how fast each side replies, what isn't a revision, and what extra rounds cost. Write it in plain words, addressed to the client, and put it in your proposal and on your website. Below is a policy you can copy, how to fill in each part, and three filled-in examples.
This is a template, not legal advice. Rules differ by country and state; ask a lawyer for anything that matters.
Revision policy template
Copy this, replace everything in [brackets], and delete any section that doesn't apply to your work.
Revision policy
If you need this as contract wording rather than a client-facing policy, the revision clause generator writes the clause from the same numbers. The policy explains the rules; the clause is what you sign.
Revision policy vs revision clause: which do you need?
Most freelancers need both, and they say the same thing in two registers.
| Revision policy | Revision clause | |
|---|---|---|
| What it is | Your business rules, written for the client | Contract text both sides sign |
| Who reads it | The client, before and during the project | The client at signing; a lawyer if there's a dispute |
| Tone | "You have 5 working days to review" | "Client shall provide feedback within five (5) business days" |
| Where it lives | Proposal, website FAQ, kickoff email, review link | Inside the contract or statement of work |
| How often it changes | When your process changes | Per contract |
The policy does the day-to-day work. Clients don't reread a contract when they're deciding whether to send one more email of changes, but they do see a short policy that's in the kickoff email and linked from every review.
Writing it down also matters for a legal reason in some places. In New York City, for example, freelance contracts worth $800 or more must be in writing and must "spell out the work you will perform; the pay for the work; and the date you get paid" (NYC Department of Consumer and Worker Protection). A revision limit isn't one of the required items, but "the work you will perform" is easier to prove when the number of rounds is part of it.
How to fill in each part
| Section | What to decide | Example |
|---|---|---|
| 1. What's included | Number of rounds, and whether it's per deliverable or per project | 2 rounds per deliverable |
| 2. What one round is | The one-list rule, in your words | One list, one version, sent together |
| 3. Who sends feedback | That a single person consolidates and approves | The client's marketing lead |
| 4. How to send feedback | One channel per round | Your review link, or a single email |
| 5. How long each side takes | Their review window and your turnaround | 5 working days / 3 working days |
| 6. What isn't a revision | New work, approved work, your own errors | As in the template |
| 7. Extra rounds | A price per round, per hour or a flat fee | $375 per round |
| 8. Approval | What closes a round, and when final files go out | Written approval; files after final payment |
| 9. Pauses | When silence pauses the project | 15 working days |
Section 1: how many rounds?
Two or three is the common default. Really Good Designs says "Most agencies include two or three rounds of revisions by default" (Really Good Designs). The reasoning for picking a number per project type is in how many revisions a designer should include.
Decide whether rounds are per deliverable or per project. "Two rounds on the whole website" and "two rounds on each of six pages" are very different promises.
Sections 3 and 4: one sender, one place
These two sections stop the most common way a round falls apart: several people commenting in several places, with nobody merging the notes.
"like a stream of consciousness run on sentence and never consolidate" (Reddit r/editors, 2024)
A second channel causes the same problem from the other side. One commenter on a social media managers forum described clients sending a separate "summary email" that contradicts their own timestamps (Reddit r/SocialMediaManagers, 2026). Naming one channel in the policy gives you something polite to point to: "Could you add these to the review link so they're part of Round 2?"
Section 7: how to price an extra round
Set the price from your own numbers, not a market rate. Example: if a round usually takes you 5 hours and your rate is $75, a fair per-round price is $375.
| Model | Example wording | Suits | Watch out for |
|---|---|---|---|
| Per round | "Each extra round: $375" | Most design and web work | Huge rounds; pair it with the one-list rule |
| Per hour | "Extra changes billed at $75/hour" | Work where change size varies a lot | Clients can't predict the bill; send an estimate first |
| Flat fee | "Up to 2 extra rounds: $600" | Clients who like one fixed number | You absorb the risk if both rounds are big |
Example values. Really Good Designs gives similar sample wording: "$150" per extra round, "$90 per hour", or "a flat $300" (Really Good Designs).
To see what unpriced rounds have cost you over a year, run your numbers through the scope creep calculator.
Sections 5 and 9: review windows and pauses
Long silences are where rounds get lost. A client goes quiet for a month, then returns with feedback on a version nobody remembers. The review window in section 5 sets a due date for every version; the pause rule in section 9 covers the client who misses it by weeks. Together they reset the schedule without blaming anyone, and they tell the client the project won't sit open forever.
Three filled-in examples
All three are examples with round, illustrative values. Adjust the numbers to your own work.
Example A: solo logo designer. Logo work starts with options, so the policy counts concepts and refinements separately.
Example A: logo design
Example B: three-person web studio. A website has stages, and a round in design is not the same as a round in build. The policy sets rounds per stage.
Example B: website project
Example C: monthly retainer. On a retainer, the limit moves from rounds to hours. The policy says so plainly.
Example C: retainer
Where should you put your revision policy?
Put it everywhere the client makes a decision about feedback:
- In the proposal, next to the price, so the limit and the extra-round cost are agreed together.
- On your website, as a short FAQ answer or a policy page. Clients who see it before they hire you don't argue with it later.
- In the kickoff email, as a short summary with a link to the full policy.
- On every review, as a line at the top: "Round 2 of 2. All changes in one list by Friday, please."
Our guide on how to limit revision rounds has the kickoff and last-round emails to send with it.
If you collect feedback in TweakTick, rounds are numbered versions and each one closes with the client's emailed approval code, so the round count in your policy matches what the client actually approved. See pricing for the plans.
When not to use this template
- One-off small jobs. A single social graphic doesn't need nine sections. One line works: "Includes 1 round of changes; extra rounds $X."
- Hourly work with no fixed price. If every change is already billed, a round limit adds nothing. Use the retainer version, or just a feedback window.
- Agile or sprint-based builds. If scope is reset each sprint, rounds are the wrong unit. Limit by sprint and agree what's in each.
- When the contract says something different. The policy and the contract must match. If they conflict, the contract wins, and the client will point that out. Update both together.
- Anything with legal weight. Deposits, refunds, ownership and cancellation belong in the contract, checked by a lawyer where you work. The policy explains; it doesn't replace the contract.
Your next step: paste the template into a document, fill the nine brackets with your real numbers, and add a link to it in your next proposal.
Make the policy visible on every round
Send each version as one link, numbered by round, and close it with the client’s written approval.
Denzil Sequeira
Founder of TweakTick. He builds it on his own and answers every support email himself. Every number in this article links to its source.