TweakTick
FeaturesFormatsIntegrationsBlog
PricingFoundingFree toolsSign inStart free
  1. Home
  2. Blog
  3. How Many Revisions Should a Designer Include?

Scope and revisions

How Many Revisions Should a Designer Include?

Most designers include two or three revision rounds. How to define a round, pick your number, price extra rounds, and a revision clause to copy.

DS
Denzil Sequeira, founder

Updated 20 Nov 2026 · 7 min read

Example
Revision rounds
Round 1 included
Included
Round 2 included
Included
Round 3 billable
+$450 billable

Key takeaways

  • Two or three included rounds is the most common default; one to three is the usual range.
  • A round is one consolidated list of changes on one version, within the agreed direction.
  • Price extra rounds per round, per hour or as a flat fee, and end every round with a written approval.
On this page
  • What is the standard number of revisions for a designer?
  • What counts as one revision round?
  • How do you choose the right number for a project?
  • What should you charge for extra revision rounds?
  • A revision clause you can copy
  • How do you stop revision rounds from running over?
  • Should you ever offer unlimited revisions?
  • What to do next

Most designers include two or three rounds of revisions in the project price, and the commonly quoted range is one to three. Write the number into the contract and the estimate, say what one round means, and set a price for every round after that. The number matters less than the definition: "three rounds" with no rules can still turn into thirty emails.

Below: what published sources say, a definition you can put in a contract, a number for each kind of project, three ways to price extras, and a clause to copy.

What is the standard number of revisions for a designer?

There is no legal or industry standard, but published advice clusters in the same place:

SourceWhat it says
Trillion Creative (design studio, 2019)"One to three rounds of revisions are common for graphic design projects." Most of its own projects include two. [1]
Really Good Designs (agency guide)"Most agencies include two or three rounds of revisions by default." [2]
Millo (freelance business blog, updated January 2024)No fixed number: put a limit in the contract and set milestones for feedback. [3]
Ashore (proofing tool blog, 2022)"The exact number will vary depending on the project's complexity." Say how many rounds up front. [5]

So the honest answer to "how many revisions should a designer include?" is one to three, with two or three the most common default. Below one, clients feel rushed and nervous about signing. Above three, the extra rounds rarely improve the work; they usually mean the brief was unclear or the wrong person is giving feedback.

What counts as one revision round?

This is where most disputes start. A client who sends nine separate emails over a week may believe that was one round. You may count it as nine. Settle it before the work starts.

A clear definition has three parts:

  1. One consolidated list. A round is all the feedback on one version, sent together, from the people who are allowed to decide. Ashore puts it simply: the changes you make based on that set of feedback "will count as one round of revisions." [5]
  2. Changes within the agreed direction. Moving, resizing, recoloring and rewording are revisions. A new concept, a new page or a new audience is a change of scope and gets its own quote.
  3. A reply window. For example, five working days to send the list. Feedback that arrives after the window starts the next round.
Example
Is this one round?
3 of 4
One list from one person
On one version
Inside agreed direction
Sent within 5 working days
The three tests one round has to pass before it counts as a single round (example)

The AIGA's standard design agreement handles the scope side with a threshold rather than a count. As quoted by A List Apart, if requested changes amount to "a revision of at least 15% of the time required" to produce the deliverables, the designer can submit "a new and separate Proposal," and work on the revised services waits until it is signed. [4] You don't need the same number, but a written threshold like this stops a "small tweak" from quietly becoming a redesign.

How do you choose the right number for a project?

Start from two, then adjust. This is our rule of thumb, not a published standard:

Project shapeIncluded roundsWhy
Small, well-briefed job (a social graphic, a one-page edit)1–2Little to interpret; extra rounds mostly mean indecision
Typical brand or website design2–3Room for one direction change and one polish pass
Many stakeholders (a committee, a board, legal review)3, with one named decision-makerMore voices need more passes, but only one person signs off
Fixed-budget or rush job1–2, priced extrasA tight budget can't absorb open-ended changes

Two checks help before you commit to a number:

  • Who decides? Name one person on the client side who sends the consolidated list and approves the round. A round that waits for five people to agree is really five rounds.
  • What happens at the end? Every included round should end with a clear "yes, move on" in writing, so the next stage starts from an approved version and not from memory.

Count every round, and keep the yes

Send each version as one link: clients comment on the work and approve the round with a code.

Start free

What should you charge for extra revision rounds?

Pick one of three models and write it into the estimate, so nobody is surprised by the invoice:

  • Per round. A flat price for each extra round. Really Good Designs gives the example of a proposal with two included rounds and "each extra round is $150." [2]
  • Per hour. Best when the amount of feedback is hard to predict. The same guide suggests wording such as "Additional changes beyond the two included rounds will be billed at $90 per hour." [2]
  • Flat fee. One price for all revisions after the included rounds, for example "a flat $300," in that guide's example. [2]

Those dollar figures are examples from one guide, not market rates. Use your own hourly rate.

It also helps to see what unbilled rounds cost you over a year. Example, with made-up numbers:

InputExample value
Hours one extra round takes you4
Your hourly rate$75
Projects a month that slip one unbilled round2
Unpaid work per month8 hours
Unpaid work per year$7,200

The scope creep calculator does the same sum with your own figures.

Free tool

ExampleUnbilled rounds cost you$4,800 / yearScope creep calculatorPut a yearly number on extra rounds you never billed.Open

A revision clause you can copy

Adapt this to your project and have it checked for your country. It is a template, not legal advice.

Revision clause

Revisions. The fee includes [two] rounds of revisions on each deliverable. A round is one consolidated list of changes, sent by [client contact name] within [five] working days of receiving a version. Feedback sent after that window, or in separate messages after the list, starts the next round. Scope. Revisions are changes within the approved direction, such as layout, color, copy and image swaps. A new concept, new pages or new deliverables are out of scope and will be quoted separately before work starts. Extra rounds. Rounds beyond those included are billed at [$X per round / $X per hour], with an estimate sent for approval first. Approval. Each round ends when [client contact name] approves the version in writing. Changes requested after approval are handled as a new change request.

If you'd rather fill in the blanks with your own numbers, the revision clause generator writes a version for you, and the change request form handles changes that arrive after sign-off.

How do you stop revision rounds from running over?

A clause sets the rules, but the process keeps a project inside them:

  • Collect feedback in one place. Feedback split across email, chat and phone calls is the most common way one round becomes three. In our own research, 103 of the 601 reviews of feedback tools we coded (2024–26) praised the same thing: feedback in one place, fewer emails and faster rounds (our data). One reviewer wrote that a tool "saved my clients and my team a lot of time in the revision process." [6]
  • Ask for comments on the work itself. "The button near the top" is vague; a comment pinned on the button is not. Our guide on how to get client feedback on a website covers this step by step.
  • Count rounds out loud. Put "Round 2 of 3" in the subject line or on the review link. People spend rounds more carefully when they can see how many are left.
  • Close each round in writing. A short approval message ("Version 2 approved, move to build") turns a vague "looks fine" into something you can point to later.

This is the job TweakTick was built for: clients pin comments on the live site, image, PDF or video with no account, and approve each round with a code sent to their email, so the count and the approval are recorded together. The free plan covers websites, images, PDFs and videos up to 3 minutes; longer videos need a paid plan (pricing).

Should you ever offer unlimited revisions?

Rarely. Millo's Preston Lee asks designers whether they allow "3?", "10?", "20?" or "100?" revisions and argues for limits written into the contract, plus milestones that tell clients when feedback is due. [3] Unlimited revisions usually signal that the price was never tied to the time.

The exceptions are narrow: a retainer billed by the hour, where every change is paid for anyway, or a fixed-price product with a tightly limited choice (for example, three logo directions and minor tweaks only). In both cases the limit still exists; it has just moved from the number of rounds to the hours or the options.

What to do next

Pick your number for the next proposal now, before the client asks. Write it next to the fee, paste the definition of a round from the clause above, and repeat both in the first review email: "Here is version 1. This is round 1 of 2." Clients rarely argue with a limit they read before they signed; they argue with one they hear about in round four.

Count every round, and keep the yes

Send each version as one link: clients comment on the work and approve the round with a code.

Start freeSee pricing
DS

Denzil Sequeira

Founder of TweakTick. He builds it on his own and answers every support email himself. Every number in this article links to its source.

Sources

  1. Trillion Creative, "How many rounds of revisions should your graphic design company provide?" (January 2019)
  2. Really Good Designs, "How to Charge for Revisions (If You’re a Creative Agency)"
  3. Millo, "How many design revisions do your clients get?" (updated January 2024)
  4. A List Apart, "Designing Contracts for the XXI Century" (2012), quoting AIGA Standard Form of Agreement clause 4.2
  5. Ashore, "End The Endless Cycle Of Design Revision" (updated February 2022)
  6. ruttl review on Trustpilot (November 2025)

Share this article

  • X
  • LinkedIn
  • Facebook
  • Email

On this page

  • What is the standard number of revisions for a designer?
  • What counts as one revision round?
  • How do you choose the right number for a project?
  • What should you charge for extra revision rounds?
  • A revision clause you can copy
  • How do you stop revision rounds from running over?
  • Should you ever offer unlimited revisions?
  • What to do next
All articles

Keep reading

  • Example
    clientsite.com
    1
    2
    3
    SK
    Sara, client
    Can the button say Book now?

    How to Get Client Feedback on a Website: 4 Steps

    Send one link to the real site, ask for comments on the page, give three questions and a deadline, then close the round in writing. Templates included.Read7 min read
  • 91
    of 601 reviews complain about price or seats

    Website Feedback Tool Reviews: What 601 Reviews Say

    We coded 601 public reviews of website feedback tools (2024-26): what agencies praise and complain about, tool by tool, and why they switch.Read10 min read
  • Example
    Compared
    TweakTick
    Other tool
    MarkUp.io
    Pastel
    ruttl
    BugSmash

    MarkUp.io Alternatives After the Price Rise

    Seven MarkUp.io alternatives compared on free plans, real prices checked Nov 13, 2026, client accounts and file types, plus a migration checklist.Read10 min read

Free tools for this

  • Revision clause generatorSay how many rounds are included, and what happens after.
  • Scope creep calculatorPut a yearly number on extra rounds you never billed.
  • Change request formA change after sign-off becomes a new, priced request.

Free, no sign-up. All free tools

TweakTick

Every tweak. Every tick.

Product

  • What’s new
  • All features
  • All formats
  • PDF proofing
  • Video review
  • Design feedback
  • Client approvals
  • Integrations
  • Support
  • What’s not supported yet

Resources

  • Blog
  • Help
  • Free tools
  • Compare
  • About

Free tools

  • Scope creep calculator
  • Change request form
  • Revision clause generator
  • Kill fee calculator
  • Freelance rate calculator
  • Sign-off form generator
  • Compare images
  • Screenshot annotator
  • PDF annotator
  • Approval email templates

Compare

  • TweakTick vs BugSmash
  • TweakTick vs MarkUp.io
  • TweakTick vs Pastel
  • TweakTick vs ruttl
  • TweakTick vs BugHerd
  • All comparisons

Legal

  • Terms of Service
  • Privacy Policy
  • Data Processing Agreement
  • Sub-processors
  • Refund Policy
  • Your privacy choices
  • Security

Secure checkout by Paddle

  • AMEX
  • GDPR READY: read our data processing agreement
  • CCPA READY: read the California section of our privacy policy
  • SOC 2 READY: read how our controls follow the SOC 2 Security criteria

© 2026 TweakTick

Photo credits