Key takeaways
- Price an extra round from the hours a round really takes you, times your hourly rate, rounded up.
- A per-round price with an hours cap is simple for clients and protects you from the huge round.
- Write the price in the proposal, quote it again before the round starts, and bill it as its own line.
On this page
- What you need before you set a price
- Step 1: Work out what an hour of your time costs
- Step 2: Measure how long one round really takes
- Step 3: Turn hours into a price per round
- Step 4: Pick a pricing model (with worked numbers)
- Step 5: Put the price in the proposal
- Step 6: Quote the round before you start it
- Step 7: Invoice the extra round as its own line
- How much does not charging for revisions cost you?
- What if your contract doesn't mention extra revisions?
- Which changes shouldn't you charge for?
- Common mistakes when charging for revisions
- What to do when…
To charge for extra revisions, set a price per extra round from your own numbers (the hours a round really takes you, times your hourly rate), write it in the proposal next to the included rounds, and quote it again before the round starts. Then bill it as its own line on the next invoice. The hard part is rarely the price. It's saying it out loud at the right moment, which is why this guide includes the numbers, the wording and the invoice line.
Most agencies don't do this. Ignition's 2025 survey of 273 agency managers and executives found that 78% rarely or only sometimes charge for out-of-scope work (Ignition, May 22, 2025). Extra revision rounds are the easiest part of that to fix, because you can agree the price before the project starts.
What you need before you set a price
- Your hourly rate. The real one, worked out from what you need to earn, not what you think clients will accept.
- Your hours per round from your last three or four projects. Rough is fine.
- Your included rounds. Two or three is the usual default; if you haven't picked yours, read how many revisions a designer should include first.
- Your proposal template, because that's where the price goes.
Step 1: Work out what an hour of your time costs
If you only quote fixed project prices, you may never have pinned down an hourly figure. You need one now, because an extra round is extra hours.
Start from what you need to earn in a year, add your costs, and divide by the hours you can actually bill (not 40 a week: admin, sales and gaps eat a lot of it). The freelance rate calculator does this from your own figures.
For the rest of this guide we'll use an example rate of $80 an hour.
Step 2: Measure how long one round really takes
Look back at recent projects and count everything a round involves, not only the design changes. Reading and sorting the feedback, asking what a vague comment means, making the changes, exporting, checking, writing the reply. That last part is the bit people forget.
| Project (Example) | Reading and replying | Changes | Export and check | Total hours |
|---|---|---|---|---|
| Restaurant site, round 3 | 1.0 | 2.0 | 0.5 | 3.5 |
| Logo, round 3 | 0.5 | 4.0 | 0.5 | 5.0 |
| Brochure, round 3 | 1.0 | 3.0 | 0.5 | 4.5 |
| Average | 4.3 |
Example values. Use your own time logs or best estimates.
Round the average up, not down: our example becomes 4.5 hours. Rounds that run over are more common than rounds that finish early.
Step 3: Turn hours into a price per round
Example: 4.5 hours at $80 an hour is $360. Round it to a clean number the client can remember: $375 per extra round.
That's the whole calculation. Two adjustments are worth considering:
- Add a little for disruption. An unplanned round lands in a week you'd planned for other work. Rounding up covers some of that.
- Don't discount it to be nice. A cheap extra round tells the client rounds are cheap, and you'll get more of them.
Step 4: Pick a pricing model (with worked numbers)
There are three common ways to charge. Really Good Designs describes the same three in its guide, with sample wording of "$150" per extra round, "$90 per hour", or "a flat $300" for all extra revisions (Really Good Designs). Those are examples from one article, not market rates; your own numbers from steps 1–3 matter more.
Here is how the models compare on the same three rounds of different sizes, using our example rate of $80 an hour and $375 per round.
| Round size (Example) | Hours | Per round, $375 | Hourly, $80 | Per round with a 6-hour cap, then $80/hour |
|---|---|---|---|---|
| Small: a few text and color tweaks | 1.5 | $375 (you earn $250/hour) | $120 | $375 |
| Typical | 4.5 | $375 ($83/hour) | $360 | $375 |
| Big: a section redesigned | 9 | $375 ($42/hour) | $720 | $615 ($68/hour) |
Example values. Effective rate = price ÷ hours.
What the table shows:
- Per round is easy for clients to understand and budget, and the simplest to explain. The risk is the big round: at 9 hours, your rate halves.
- Hourly is always fair to you, but the client can't predict the bill, and every invoice invites a debate about hours.
- Per round with a cap keeps the simple price for normal rounds and protects you from the huge one. It's our default recommendation for web and design work, because the cap only comes into play when a round has grown into new work.
A flat fee for "all remaining revisions" is the riskiest for you. It works only on small, well-defined jobs where you know what's coming.
Step 5: Put the price in the proposal
The price has to be agreed before the work starts, in the document the client actually reads. Put it on the same page as your fee, not buried in terms.
Proposal wording: extra rounds
If you want this as contract clause wording rather than proposal text, the revision clause generator writes it from your numbers.
Step 6: Quote the round before you start it
When the client sends feedback after the last included round, reply with the price before touching the file. Give them a free option too, so the price never feels like a trap.
Email: quoting an extra round
A yes in email is enough. Don't start on "sounds fine, let's chat later."
Step 7: Invoice the extra round as its own line
Bill extra rounds on the next scheduled invoice, or immediately if the project is long. Give each one its own line so the client can see exactly what it was for, and match the wording to the quote you sent.
Invoice line
If a round went over the cap, add a second line for the extra hours, again referring to the email where you quoted them.
How much does not charging for revisions cost you?
More than it feels like, because unbilled rounds hide inside a fixed fee. Here is one example year: you run 20 projects, and half of them slip one unbilled round of 4.5 hours at $80.
| Example | Value |
|---|---|
| Projects a year | 20 |
| Projects with one unbilled round | 10 |
| Hours per round | 4.5 |
| Hourly rate | $80 |
| Work given away in a year | 45 hours, $3,600 |
Example values. With your own numbers, the scope creep calculator puts a yearly figure on it, which is often the push needed to send the first quote.
What if your contract doesn't mention extra revisions?
You can still charge, but you're asking, not enforcing. Be upfront and reasonable.
- Name the problem calmly. "We didn't set a revision limit for this project, which is my oversight. We're now on round five."
- Propose a fair line from here. "From the next round, I'd like to charge [$375] per round. Everything so far is included."
- Don't charge backwards. Billing for rounds already done, without agreement, is the fastest way to an unpaid invoice.
- Fix it for next time. Add the proposal wording above to your template today.
Which changes shouldn't you charge for?
Charging for the wrong things costs more goodwill than it earns. Don't bill for:
- Your own mistakes. A missed brief item, a typo you introduced, a broken link. These are fixes, not revisions.
- Things that don't work as agreed. If the form doesn't send, fixing it is part of the job.
- Feedback that arrives within an open round. If the round is still open and the notes come from the approver, fold them in.
Do charge for new direction, new content, new pages, and anything that arrives after a version was approved. Our scope creep email templates cover the conversations for bigger new requests.
Common mistakes when charging for revisions
- A price nobody wrote down. If it's not in the proposal, every extra round is a negotiation.
- Pricing by guesswork. Measure your hours; most people underestimate them.
- Starting the work, then sending the bill. Quote, get a yes, then start.
- Apologizing for the charge. You set the price at the start. You're only reminding the client.
- Counting silently. Put "Round 2 of 2" on every version, so the extra round is never a surprise. Our guide on how to limit revision rounds shows how.
What to do when…
The client asks for a discount on extra rounds. Offer fewer changes instead of a lower price: "If we pick the three most important changes, I can do it as a smaller round for [$200]."
It's a retainer client. Put a revision allowance in the monthly scope (for example, two rounds per deliverable) and quote anything beyond it the same way.
The change takes ten minutes. Do it once as goodwill and say so. If small changes keep coming, set a minimum charge, such as one hour, in your proposal.
They want it faster. You can add a rush fee for turnaround inside 48 hours; 25–50% on top is an example, not a rule. The rush fee calculator works one out from your own fee. Put it in the proposal so it isn't a surprise.
Your next step: work out your price per extra round with the two calculators above, and add the proposal wording to your template before you send the next quote.
Show which round the client is on
Send every version as a numbered round, so the extra one is never a surprise.
Denzil Sequeira
Founder of TweakTick. He builds it on his own and answers every support email himself. Every number in this article links to its source.