What goes on a client quote
A quote is the priced offer you send a client before any work starts: for example, a brand identity quote with three line items, 20% VAT, a 40% deposit on acceptance, two review rounds included and a 30-day validity date, which the client signs to say yes.
A good quote answers the client’s first three questions (what do I get, what does it cost, when do I pay) and quietly settles the next three (how many changes, who decides, what if we stop).
- Line item
- One thing the client is buying, with a quantity and a price for each unit. "Inner page templates, 3" reads more clearly than one large "website" figure, and it makes it easy to drop an item if the budget is tight.
- Valid for
- How many days the price holds. After that you can re-quote, which protects you when a client comes back months later expecting the same price for a bigger job.
- Deposit
- The share of the total the client pays when they accept the quote, before you start. The quote shows the deposit and the balance due on approval of the final files.
- Discount
- An optional reduction shown as its own line, so the client sees the full value of the work and the saving separately. Leave it blank if you are not offering one.
- Tax line
- Sales tax, VAT or GST if you charge it. Give it the label used where you work. The generator applies it after any discount and leaves it off if the field is blank.
- Review rounds included
- How many rounds of client feedback the price covers. Putting the number on the quote, not only in the contract, is what makes round four a priced conversation instead of a favour.
- Acceptance
- The client’s signature and date on the quote. Once signed, the quote is the agreed price and scope, and anything outside it becomes a change request.
Example quotes, totalled
Each example below is made up. The prices are placeholders to show how the totals, tax, discount and deposit lines look, not suggested rates: always use your own numbers.
| Example | Lines | Subtotal | Discount | Tax | Total | Deposit | Rounds included |
|---|---|---|---|---|---|---|---|
| Example: website design | 3 | $4,350 | — | — | $4,350 | $2,175 | 3 |
| Example: brand identity | 3 | £2,250 | — | £450 | £2,700 | £1,080 | 2 |
| Example: video edit | 3 | €1,960 | €196 | — | €1,764 | — | 2 |
| Example: landing page, one line | 1 | CA$2,400 | — | CA$312 | CA$2,712 | CA$813.60 | 3 |
| Example: illustration set | 1 | ₹52,000 | — | ₹9,360 | ₹61,360 | ₹30,680 | 2 |
Check these before the quote goes out
A line with a missing price is left off the quote
If a line item has a description but no valid quantity or unit price, the generator leaves it out of the totals and flags it in the controls. Nothing is guessed, so a half-filled line never turns into a silent zero on a document the client signs.
Tax rules belong to your country, not the quote tool
Whether you charge tax, at what rate, and what the quote must show to be valid for tax depends on where you and the client are. Check with an accountant before you quote a client in another country.
A signed quote is close to a contract
Once a client signs, the quote can be treated as the agreement. Keep the terms short and true, match them to your contract, and for larger projects send a full freelance contract as well.
Quote the rounds you can actually afford
Look back at your last few projects. If clients usually needed three rounds, quoting two invites a dispute, and quoting five gives away time. The scope creep calculator shows what the unbilled rounds cost you over a year.
Questions about writing a project quote
What is the difference between a quote and an estimate?
An estimate is a rough guide that can change as you learn more. A quote is a fixed price for a fixed scope, valid for a set time. Use a quote when the brief is clear enough to commit, and say plainly on it which one you are sending.
Should a project quote list review rounds?
Yes. Clients compare quotes on price, and the number of rounds is part of the price. Writing it on the quote means the client agreed to it before the first round, not after the fourth.
How long should a quote be valid for?
Long enough for the client to get approval inside their business, and short enough that your own prices and calendar have not changed. Choose a period you are comfortable with and print the valid-until date so nobody has to work it out.
What goes in the kill fee line of a quote?
A short promise: if the client cancels after accepting, work done is paid in full plus a share of the unfinished part. Use the kill fee calculator to test the percentage, then put the same figure in your contract.
How do I quote a change after the client accepts the quote?
Do not edit the signed quote. Send a separate change request with its own price and time, and start only once it is approved. The change request form builds that page for you.
Can I turn this quote into an invoice?
The quote is the offer, not the bill. Copy the line items into your invoicing tool once the work is approved, and refer to the quote number on the invoice so the client can match them.
Is anything I type into the quote generator uploaded?
No. The quote is built and totalled in your browser. Nothing is saved or sent, so copy the text or print it to PDF before you close the page.